Type: | Ni-MH/Ni-CD Battery Pack |
---|---|
Connection Mode: | Series and Parallel |
Rechargeable: | Chargeable |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
NICD rechargeable battery AA size 600mAh 0.6Ah 12 Volt 7.2 Volt 1.2 Volt nickel cadmium battery cells
Description | Unit | Specification | Conditions | |
Nominal Voltage | V/Cell | 1.2V | Unit cell | |
Nominal Capacity | mAh | 600 | Standard Charge/Discharge | |
Standard Charge | mA | 60(0.1C) | Ambient Temperature: Ta= 20±5ºC |
|
Hour | 16 | |||
Trickle Charge | (0.03C)~(0.05C) | Ta = 0~45ºC | ||
Standard discharge | mA | 120(0.2C) | Ambient Temperature: Ta = 20±5ºC Humidity:Max:85% |
|
Discharge Cut-off Voltage | V/Cell | 1.0 | ||
Operating temperature range | ºC | 0~45ºC | Humidity:Max:85% | |
Storage Temperature | ºC | -20~35ºC | 1 year | Fully charged state,Humidity,Max.60% |
0~60ºC | 1 week | Fully charged state,Humidity,Max.80% | ||
Typical Weight | g | Approx. 17.0 |
Test | Unit/ | Specification | Other Condition | Remarks |
Capacity | mAh | 600 | Standard Charge Discharge | Up to 3 cycles are allowed |
Open Circuit Voltage(OCV) |
V/Cell | ≥1.25 | Within l hour after standard Charge | |
Internal Impedance | mΩ/Cell | ≤40 | Upon fully charge (l KHz) | |
High Rate Discharge(0.5C) |
minute | ≥48 | Standard Charge, l hour rest Before Discharge by 1.0C to 1.0 V |
up to 3 cycles are allowed |
Overcharge | No leakage nor explosion | 0.1C Charge14 days | ||
Charge Retention | mAh | ≥390(65%) | Standard Charge, Storage:45ºCAmbient Temperature,Standard Discharge/45ºC, | |
IEC Cycle Life | Cycle | ≥500 | IEC61951-1(2003)7.4.1.1 | |
Leakage Test | No leakage nor deformation | Fully charged at 0.5C for 2.5 hour stand for 14 days. | ||
Security Test | No explosion,but leakage or deformation is allowed | Charge the cell 0.1C 16hrs, Then≤100 mΩImpedance short circuit for 1hour |
Ambient Temperature T=20±5ºC |
|
Impact Resistance |
Change of voltage should be under 0.02V/ Cell Change of impedance should be under 5 mΩ/ Cell
|
Charge the cell 0.1C 16hrs Then leave for 1~4hrs,check battery before/after dropped, Height 50cm Wooden board (thickness 30mm) Direction not specified,3 times. |
Ambient Temperature T=20±5ºC |
|
Vibration Resistance |
Change of voltage should be under 0.02V/cell, Change of impedance should be under 5 milliohm/cell
|
Charge the battery 0.1C 16hrs, then leave for 24hrs,check Battery before/after vibration, Amplitude 1.5mm Vibration 3000CPM, Any direction for 60mins. |
Ambient Temperature T=20±5ºC |
1.We offer OEM/ODM services with our professional team.
2.We have own molding workshop.
3.Low MOQ,more friendly for different customer.
4.Prompt reply,we will give reply within 2 hours.
5.About samples,we will produce in short time.
6.We have own transportation partner,it will make easy to delivery battery
Q:How long is the warranty?
A: 4 years.
Q:Do you accept OEM/ODM?
A: Accept, send us your requirement/draft ,we will produce battery according to your requirement/draft.
Q:What's your payment method?
A:We accept T/T(30% deposit,and 70% balance before shipment).
Q:What's the price terms?
A:We accept FOB JIANGMEN/HONG KONG/DDP/EXW.
Q:What is the lead time for mass production?
A:22-25 days after order confirmed.
Q:Can you provide samples before place order?
A:Yes,we can provide samples and data sheet for your testing first.
Q:How do you ship batteries?
A:We can ship batteries by SEA/AIR which according to your requirement.
We advised ship by SEA which more cost-effective.
Q:What kind of certificate do you have?
A: We have CE, CB,IEC,KS,RoHS, SGS, MSDS, ISO9001, TUV certificates and reports,also can apply certificates according your needed.
Q:How do we place an order?
A:Send us an Inquiry or text us,we will instruct you to place an order.
Q:What's the order procedure?
A:Send us Enquiry→battery detail and price confirmed→send purchase order to us→Pay Deposit 30%→Battery production→Pay Balance payment 70% before shipment→Battery send out.
Suppliers with verified business licenses