Type: | Ni-CD Battery |
---|---|
Usage: | Car, Bus, UPS, Electric Power, Lighting, Boat |
Nominal Voltage: | 1.2V |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Rechargeable Ni-CD Battery Pack 2.4V 4.8V 6V AA900mAh Combination for Lights With IEC Approval
Description | Unit | Specification | Conditions | |
Nominal Voltage | V/Cell |
1.2V | Unit Cell | |
Nominal Capacity |
mAh | 900 | Standard Charge/Discharge | |
Standard Charge | mA | 90(0.1C) | Ambient Temperature: Ta= 20±5ºC |
|
Hour | 16 | |||
Trickle Charge |
(0.03C)~(0.05C) | Ta = 0~45ºC |
||
Standard discharge |
mA | 180(0.2C) | Ambient Temperature: Ta = 20±5ºC Humidity:Max :85% |
|
Discharge Cut-off Voltage |
V/Cell | 1.0 | ||
Operating temperature range |
ºC |
0~45ºC | Humidity:Max :85% |
|
Storage Temperature |
ºC |
-20~35ºC |
1 year | Fully charged state,Humidity,Max.60% |
0~60ºC |
1 week | Fully charged state,Humidity,Max.80% |
||
Typical Weight | g | Approx. 20.0 |
Test | Unit | Specification | Other Condition | Remark |
Capacity | mAh | 900 | Standard Charge Discharge | Up to 3 Cycles are allowed |
Open Circuit Voltage(OCV) | V/Cell | ≥1.25 |
Within 1 hour after standard Charge | |
Internal Impedance | mΩ/Cell | ≤35 |
Upon fully charge(1 KHz) | |
High Rate Discharge(1.0C) | minute | ≥48 |
Standard Charge, l hour rest Before Discharge by 1.0C to 1.0 V/cel |
Up to cycles are allowed |
Overcharge | No leakage nor explosion |
0.1C Charge14 days |
||
Charge Retention | mAh | ≥585(65%) |
Standard Charge, Storage:45ºCAmbient Temperature,Standard Discharge |
|
IEC Cycle Life | Cycle | ≥500 |
IEC61951-1(2003)7.4.1.1 |
|
Leakage Test | No leakage nor deformation |
Fully charged at 0.5C for 2.5 hour stand for 14 days. |
||
Security Test | No explosion,but leakage or deformation is allowed |
Charge the cell 0.1C 16hrs, Then≤100 mΩImpedance short circuit for 1hour |
Ambient Temperature: T=20±5ºC |
|
Impact Resistance | Change of voltage should be under 0.02V/ Cell Change of impedance should be under 5 mΩ/cell |
Charge the cell 0.1C 16hrs Then leave for 1~4hrs,check battery before/after dropped, Height 50cm Wooden board (thickness 30mm) Direction not specified,3 times. |
Ambient Temperature: T=20±5ºC |
|
Change of voltage should be under 0.02V/cell, Change of impedance should be under 5 milliohm/cell/ |
Charge the battery 0.1C 16hrs, then leave for 24hrs,check Battery before/after vibration, Amplitude 1.5mm Vibration 3000CPM, Any direction for 60mins. |
Ambient Temperature: T=20±5ºC |
1.We offer OEM/ODM services with our professional team.
2.We have own molding workshop.
3.Low MOQ,more friendly for different customer.
4.All email,we will give reply within 2 hours.
5.About samples,we will produce in short time.
6.We have own transportation partner,it will make easy to delivery battery
Q:How long is the warranty?
A: 4 years.
Q:Do you accept OEM/ODM?
A: Accept, send us your requirement/draft ,we will produce battery according to your requirement/draft.
Q:What's your payment method?
A:We accept T/T(30% deposit,and 70% balance before shipment).
Q:What's the price terms?
A:We accept FOB JIANGMEN/HONG KONG/DDP/EXW.
Q:What is the lead time for mass production?
A:22-25 days after order confirmed.
Q:Can you provide samples before place order?
A:Yes,we can provide samples and data sheet for your testing first.
Q:How do you ship batteries?
A:We can ship batteries by SEA/AIR which according to your requirement.
We advised ship by SEA which more cost-effective.
Q:What kind of certificate do you have?
A: We have CE, CB,IEC,KS,RoHS, SGS, MSDS, ISO9001, TUV certificates and reports,also can apply certificates according your needed.
Q:How do we place an order?
A:Send us an Inquiry or text us,we will instruct you to place an order.
Q:What's the order procedure?
A:Send us Enquiry→battery detail and price confirmed→send purchase order to us→Pay Deposit 30%→Battery production→Pay Balance payment 70% before shipment→Battery send out.
Suppliers with verified business licenses